Production mgmt homework assignment | Operations Management homework help

Details of Assignment (W4): Complete problems 6.12, S6.11, S6.20, S6.23, S6.27, and S6.35 in the textbook.Submit one Excel file. Put each problem result on a separate sheet in your file. 

 (See upload for more details)

S6.11Twelve samples, each containing five parts, were taken

from a process that produces steel rods. The length of each rod in

the samples was determined. The results were tabulated and sample

means and ranges were computed. The results were:

SAMPLE

SAMPLE MEAN (in.)

RANGE (in.)

1

10.002

0.011

2

10.002

0.014

3

9.991

0.007

4

10.006

0.022

5

9.997

0.013

6

9.999

0.012

7

10.001

0.008

8

10.005

0.013

9

9.995

0.004

10

10.001

0.011

11

10.001

0.014

12

10.006

0.009

a) Determine the upper and lower control limits and the overall

means for x-charts and R-charts.

b) Draw the charts and plot the values of the sample means and

ranges.

c) Do the data indicate a process that is in control?

 

d) Why or why not? 

Need your ASSIGNMENT done? Use our paper writing service to score better and meet your deadline.


Click Here to Make an Order Click Here to Hire a Writer